EvaluationBestPractice: Difference between revisions
From Open-Xchange
Karsten.will (talk | contribs) No edit summary |
Karsten.will (talk | contribs) No edit summary |
||
Line 7: | Line 7: | ||
** documentation overview | ** documentation overview | ||
** ProofOfConcept (POC) planning | ** ProofOfConcept (POC) planning | ||
*** Goal: | *** Goal: single-server OX-installation in existing target-environment connected to existing mail-accounts and administered manually | ||
(insert Link to article describing POC Requirements / Deliverables) | (insert Link to article describing POC Requirements / Deliverables) | ||
Line 13: | Line 13: | ||
1. installed by customer | 1. installed by customer | ||
* link to install-documentation | |||
* review-webcast | |||
2. installed by OX | 2. installed by OX | ||
* requirements | * requirements | ||
Line 18: | Line 21: | ||
* handover-webcast | * handover-webcast | ||
customer | * customer evaluates the product | ||
* feedback-webcast (approx. 4 weeks later) |
Revision as of 10:09, 29 December 2011
insert bla here
- request Questionnaire (insert link here)
- initial webcast (polish existing slides, add stuff required for POC)
- product positioning
- architecture overview
- documentation overview
- ProofOfConcept (POC) planning
- Goal: single-server OX-installation in existing target-environment connected to existing mail-accounts and administered manually
(insert Link to article describing POC Requirements / Deliverables)
- setup the POC
1. installed by customer
- link to install-documentation
- review-webcast
2. installed by OX
- requirements
- (remote) installation
- handover-webcast
- customer evaluates the product
- feedback-webcast (approx. 4 weeks later)